FTRA Home›Our Work›Projects Portfolio
Sub-Menu: Our Projects
OUR WORK • PROJECTS PORTFOLIO14 Active Portfolios

OUR PROJECTS

TRANSFORMING FESTAC TOGETHER

A comprehensive civic roadmap structured across four foundational pillars: Infrastructure, Transportation, Security, and Environment. Every initiative directly enhances resident quality of life.

Subcategory:
Civic Project Matrix

Active Project Portfolio

15 projects
Infrastructure • Roads
MobilizingJoint/Partner Project

Avenue Corridors Asphalt Resurfacing & Pothole Mitigation

Targeted reconstruction and bitumen overlay across heavy transit corridors including 21 Road, 22 Road, 2nd Avenue, and 7th Avenue link junctions.

Key Milestones / Deliverables
12.4 km asphalt resurfacing and pothole patching
Reinforced concrete edge kerbing along transit turns
Installation of solar cat-eyes and reflective lane markers
Impact Metric45% reduction in vehicular breakdown & transit congestion
Execution Progress68%
Lead:FTRA Works Bureau & Lagos State Public Works Corp (LSPWC)
Location:21 Road, 22 Road, 2nd & 7th Avenues
Allocation:₦145.0 Million
Infrastructure • Drainage
In ProgressFTRA Project

Secondary Drainage Desilting & Concrete Culvert Reconstruction

Systematic hydraulic clearing of silted secondary stormwater channels and rebuilding of 28 collapsed box culverts connecting closes to major canals.

Key Milestones / Deliverables
18.6 km secondary roadside drains mechanically excavated
28 reinforced concrete box culverts cast and cured
Installation of heavy-duty galvanized drain covers
Impact MetricZero flash flooding in 42 monitored residential closes
Execution Progress74%
Lead:FTRA Environment & Works Committee
Location:1st, 2nd, 3rd, 4th & 5th Avenue Closes
Allocation:₦62.0 Million
Infrastructure • Street lighting
CompletedFTRA Project

Festac Solar Grid: Close & Walkway All-in-One Illumination

Deployment of 150W integrated monocrystalline solar streetlights along residential closes, pedestrian link corridors, and dark transit alleys.

Key Milestones / Deliverables
460 high-lumen solar LED streetlights mounted on galvanized poles
Lithium LiFePO4 batteries with 3-night cloudy reserve
Smart twilight photocell automation sensors
Impact Metric65% drop in nighttime opportunistic crimes in lit closes
Execution Progress100%
Lead:FTRA Power & Infrastructure Sub-Committee
Location:140+ Residential Closes (1st to 7th Avenue)
Allocation:₦58.5 Million
Infrastructure • Water
In ProgressJoint/Partner Project

Clean Water Project: Solar-Powered Industrial Borehole Stations

Revitalizing community water security by drilling deep aquifer industrial boreholes with automated multi-stage Reverse Osmosis (RO) filtration systems.

Key Milestones / Deliverables
14 solar-powered industrial borehole rigs
Multi-stage filtration removing iron, salinity & sediment
20,000L food-grade overhead storage per station
Impact Metric250,000 liters of potable water dispensed weekly
Execution Progress82%
Lead:FTRA Water Committee & Lagos State Water Corporation
Location:4th Avenue, 5th Avenue (A & B Close), and 23 Road Blocks
Allocation:₦48.0 Million
Infrastructure • Waste management
In ProgressFTRA Project

Festac Clean Cycle: Waste Sorting & Plastics Buy-Back Hubs

Establishing 4 neighborhood collection stations for sorting recyclable plastics, aluminum cans, and paper, monetizing domestic waste for residents.

Key Milestones / Deliverables
4 neighborhood waste sorting & baling kiosks
Digital weigh-and-pay wallet system for residents
Fleet of 8 cargo tricycles for doorstep scrap collection
Impact Metric42 tonnes of plastic diverted from canals monthly
Execution Progress60%
Lead:EcoFit Festac Management Team
Location:2nd Avenue, 5th Avenue, 23 Road & 7th Avenue Depots
Allocation:₦32.0 Million
Infrastructure • Public spaces
PlanningAdvocacy/Requested Project

Green Buffer Urban Parks & Recreational Walkways Restoration

Civic initiative and advocacy to reclaim encroached open green buffers along 2nd Avenue and 7th Avenue into landscaped exercise gardens and eco-parks.

Key Milestones / Deliverables
Eviction of illegal shanties and mechanics from green verges
Paved jogging tracks with solar garden lighting
Outdoor calisthenics fitness equipment stations
Impact Metric14,000 sqm of civic green space protected from encroachment
Execution Progress35%
Lead:FTRA Urban Planning Team & Federal Housing Authority (FHA)
Location:2nd Avenue Green Belt & 7th Avenue Peripheral Buffer
Allocation:₦85.0 Million (Estimated)
Community Facilities • Secretariat/FTRA Hall
In ProgressFTRA Project

FTRA Landmark Civic Center & 500-Seat Multi-Purpose Amphitheater

The premier civic edifice housing the central secretariat, executive council chambers, town hall conference auditorium, and archive gallery.

Key Milestones / Deliverables
Level 1: Reception, 120-seat Meeting Hall & Emergency Clinic
Level 2: Digital E-Library, Tech Lab & 60-seat Co-working Suite
Level 3: 500-Seat Grand Multi-Purpose Amphitheater & Stage
Impact MetricPermanent civic landmark anchoring resident governance
Execution Progress62%
Lead:FTRA Building Committee & Resident Patrons Consortium
Location:Plot 1021, 2nd Avenue / 21 Road Junction
Allocation:₦420.0 Million
Community Facilities • Meeting facilities
In ProgressJoint/Partner Project

Zonal & Avenue CDA Meeting Pavilions Network

Refurbishing 7 decentralized zonal community meeting sheds providing sheltered, solar-powered venues for close meetings, dispute resolution, and security briefings.

Key Milestones / Deliverables
7 solarized zonal civic pavilions with AV projection
Avenue mediation tables and resident documentation cabinets
Community notice boards and digital alert screens
Impact MetricOver 180 avenue and close meetings hosted monthly
Execution Progress75%
Lead:FTRA Community Affairs Bureau & Avenue Chairmen Forum
Location:Zones 1 through 7 (1st to 7th Avenue Nodes)
Allocation:₦24.0 Million
Community Facilities • Recreation
In ProgressGovernment Project

Festac Community Sports Arena & Youth Mini-Stadium Upgrade

Rehabilitation of the historic FHA Sports Ground into an all-weather astro-turf football pitch, basketball court, and tennis lawn.

Key Milestones / Deliverables
Standard FIFA-grade artificial astro-turf pitch
Floodlit outdoor basketball and volleyball courts
Perimeter fencing and spectators pavilion with 800 seats
Impact MetricHome to Festac Youth Football League and Vanguard Sports
Execution Progress88%
Lead:Federal Housing Authority (FHA) & Lagos State Sports Commission
Location:23 Road Sports Grounds, Festac Town
Allocation:₦180.0 Million
Security • Security initiatives
CompletedFTRA Project

Festac Safe Neighborhoods: Rapid Response Patrol & Intercom Net

Procurement of dedicated patrol vehicles, security motorbikes, high-frequency digital two-way radios, and avenue marshal uniforms.

Key Milestones / Deliverables
4 branded patrol vans and 12 rapid intervention motorbikes
Encrypted digital walkie-talkie network across 180 close gates
Vetted community security personnel with biometric IDs
Impact Metric8-minute average emergency response time across all avenues
Execution Progress95%
Lead:FTRA Central Security Committee (CSC)
Location:Town-wide coverage (1st to 7th Gate corridors)
Allocation:₦45.0 Million / Annually
Security • Surveillance
ProcurementJoint/Partner Project

Smart Festac: Perimeter AI CCTV & Automated Number Plate Recognition

Deployment of 84 smart optical PTZ cameras with automated number-plate recognition (ANPR) at all 7 entry gates and arterial intersections.

Key Milestones / Deliverables
84 solar-powered 4K AI CCTV cameras with night vision
Central control & command room with secure video archive
Automated license plate logging for all entry/exit gates
Impact Metric78% increase in recovery of stolen vehicles & crime deterrence
Execution Progress70%
Lead:FTRA Security Bureau & Lagos State Security Trust Fund (LSSTF)
Location:1st Gate to 7th Gate & Major Avenue Roundabouts
Allocation:₦68.5 Million
Security • Community safety partnerships
CompletedJoint/Partner Project

Joint Tripartite Security Architecture (Police, LNSC & Avenue Vigilantes)

Formalized operational synergy uniting the Nigeria Police (Festac Division & Area E), Lagos Neighborhood Safety Corps (LNSC), and local Avenue Vigilante guards.

Key Milestones / Deliverables
Bi-weekly joint security tactical intelligence meetings
Joint night patrols along peripheral canal boundaries
Community policing workshops and human rights compliance training
Impact MetricOver 90% resident satisfaction with neighborhood security
Execution Progress100%
Lead:FTRA Security Committee & Area E Police Command
Location:Festac Police Division, Area E Command & Avenue Posts
Allocation:₦18.0 Million / Annual Ops
Environment • Sanitation
CompletedFTRA Project

Operation Clean Festac: Monthly Avenue Sanitation & Drain Cleansing

Town-wide monthly sanitation drive equipping avenues with industrial shovels, wheelbarrows, rakes, and direct LAWMA compactor truck evacuation.

Key Milestones / Deliverables
Evacuation of 35+ tonnes of household and drainage silt per exercise
Deployment of 14 LAWMA heavy compactor trucks per cycle
Inter-Avenue "Cleanest Close of the Year" merit cup competition
Impact MetricOver 400 metric tonnes of silt safely evacuated yearly
Execution Progress100%
Lead:FTRA Environment Bureau & LAWMA
Location:All 7 Avenues & Connecting Roads
Allocation:₦12.5 Million / Annually
Environment • Greening & Tree Canopy
In ProgressFTRA Project

Festac 50,000 Trees Canopy & Oxygen Green Corridors

Ambitious urban forestry campaign planting indigenous Neem, Ashoka, Terminalia, and fruit trees along median avenues, schools, and parks.

Key Milestones / Deliverables
14,200 saplings planted and protected with iron tree guards
Community Tree Adoption scheme with digital tracking barcodes
12 school green clubs established with tree nursery beds
Impact MetricEstimated 320 metric tonnes of annual CO2 sequestration
Execution Progress78%
Lead:EcoFit Festac Greening Directorate
Location:1st, 2nd, 3rd, 4th, 5th, 6th & 7th Avenue Medians
Allocation:₦28.0 Million
Environment • Canal Buffer Zones
Advocacy ActiveAdvocacy/Requested Project

Canal Buffer Protection & Anti-Encroachment Green Wall

Strategic advocacy and physical demarcation to prevent illegal reclamation, sand-filling, and construction on natural drainage wetlands buffering Festac.

Key Milestones / Deliverables
Topographical satellite survey of 12.8 km canal buffer boundaries
Permanent concrete boundary beacons and warning signboards
Restoration of mangrove vegetation to absorb flood surges
Impact MetricProtection of vital flood plain preventing cataclysmic floods
Execution Progress40%
Lead:FTRA Environment Directorate & Lagos Ministry of the Environment
Location:Festac-Amuwo Canal & Mile 2 Buffer Wetland Boundary
Allocation:₦95.0 Million (Proposed)
Resident Engagement & Sponsorship

Have a project recommendation for your Avenue?

Submit your infrastructure needs to the FTRA Works Bureau or join as an avenue project monitor.

© 2026 FTRA COMMUNITY NETWORK
Global StrategyLocal ImpactFuture Ready
System Status: Active